Sök:

Sökresultat:

3517 Uppsatser om Planning and Building Act - Sida 1 av 235

Underlag för en kommande rivning av J-huset på Akademiska sjukhuset i Uppsala : Generell planeringshjälp vid utförande av rivning

This report is about planning a demolition. The purpose of this report is that it should become a base for a demolition of house J at the Academic hospital in Uppsala, and also to make general help for planning a demolition. This report also contains a part about how a change in the work environment affects general people. The work started with studies of literature and design of the general part of the report and then continued with a practical study of house J. From the experience of the first two parts of the report a general help for planning a demolition was shaped.

Planering och val av metod i byggprojekt

This report describes the construction process and the aspects that should be taken into consideration. It includes models of decision and how these can be used in practice. Planning of a building project is very important for a successful execution. This will be the foundation of problems that will occur during the production. In the planning process people with different positions, search for the best suitable building methods.

Ändrad användning av stationshus : fallet Ormaryds station ? ett stationshus med betydande kulturvärden

Acquiring a former station building can mean that the property owners must familiarize themselves with a lot of planning and building regulations. After the new Planning and Building Act code into force in 2011, the responsibility lie on the developer to ensure laws and regulations. Based on the regulatory framework that is available occurs sometimes balance issues, between care requirements and building codes. The station building in Ormaryd was acquired in 2009 by two individuals who intended to accommodate office and retail space in the building. In doing so a new local plan of the area was established, including regulations on how the building could be used. By including road safety and noise, the risk was not considered appropriate to use the station building for housing.

Arbetsmiljöarbetet på SverigesBostadsrättsCentrum : Vad ändringarna i arbetsmiljölagen innebär

This diploma work was performed because the company Sveriges BostadsrättsCentrum, with the abbreviation SBC, had a need to gain insight into how changes in the Work Environment Act and related regulations which took effect January 1, 2009 affecting their work with the work environment. The changes mean that the client may hand over his work environment responsibilities to a contractor and that he has to select so-called building work environment co-ordinators. At SBC they are working as representatives for tenant-owner's association when a construction is about to be carried out. The purpose was to ascertain how changes may affect the work at SBC. The diploma work intends to educate the staff at SBC how work with the work environment would look like if they met the regulatory requirements.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Metodval i projekteringsfasen : Bostadshus Ljusbojen 1

This major project in Building Engineering has its focus on inquiring into what methods has been used in the planning process of the residential buildingLjusbojen 1. This project has been conducted in cooperation with Kadesjös Ingenjörsbyrå AB, an engineering contractor firm which also acts as the property developer. Initially several different general methods for planning residential buildings have been presented. After the methods from the process of building Ljusbojen 1 has been analyzed compared to the general methods presented in part 1. This shows what the determining factors are during the planning process; factors such as cost, quality, time management, know-how and environmental issues.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Jämförelse mellan gamla PBL och nya PBL : Med fokus på bygglovets överklagande och möjlighet att vinna laga kraft

This thesis provides a comparison of the old Planning and Building Act (PBA) from 1987 with the new PBA, which entered into force in May 2011. The essay consists of a descriptive part that presents the regulation of both laws. The new PBA consists of several differences compared to previous regulation. This thesis will, however, primarily be centred around the regulation regarding building permit appeals and the possibility of building permit, to gain legal force.In the old PBL, there were no regulations that result in a building permit decision could be made effective. Instead, a building permit could, long after the decision had been made, be over-challenged.

Att bygga ett bibliotek : En studie av funktion och rörelse i tre nyinrättade biblioteksbyggnader - Kungliga tekniska högskolans bibliotek, Sambiblioteket i Härnösand och Vitterhetsakademiens bibliotek

A large part of research about libraries and library buildings in Sweden has been focused on how the building looks not how it functions with the library. The aim with this master?s thesis is to study how a library building is functioning and how its users are experiencing it. This is studied in three libraries, Kungliga tekniska högskolans bibliotek, Sambiblioteket in Härnösand and Vitterhetsakademiens bibliotek. With the questions of how they were planed, what did the libraries want from the new building and which of these demands were realized.

Från rådhus till stadshus En fallstudie på ombyggnadsprocessen Göteborgs rådhus

Uppsats för avläggande av filosofie kandidatexamen iKulturvård, Bebyggelseantikvariskt program15 hpInstitutionen för kulturvårdGöteborgs universitet2013:5.

"EFFEKTIVARE PLANPROCESSER - BOSTÄDER PÅ BEKOSTNAD AV MEDBORGARINFLYTANDE?" : - Förändringar i PBL ur en demokratiaspekt

The aim of this thesis is to examine whether law reforms in the detailed planning process can be an aspect that gets in conflict with the citizens rights to participate in the Swedish planning through dialogue, and how five chosen municipalities are working with citizen participation. To be able to answer the aim of the thesis a literature study and five semi-structured interviews was performed in purpose to get wide-ranging information from municipal officials working with detailed planning handling. Law changes that aims to make the detailed planning process more efficient has been implemented partly to satisfy the needs of dwellings since the detailed planning process among master builders seems to be slow and inefficient, which to the them means higher costs. The requirement on having a detailed planning program was taken away when the new planning law was adopted year 2011. The planning program was including a moment of citizen dialogue. The case studied municipalities have not been affected in this law change arguing that it?s still possible to bring a program if needed.

Radonfritt boende : Stegen till att eliminera radongas med rätt Grundläggningsmetod

People who live in northern part of the world spend much more time indoors than those who live in warmer countries. In addition that home should be safe, it should also protect one against heat, cold, sunlight and pollution. The indoor environment is affected by installations, material and how the building is formed. Those anomalies that are visible, felt or smelled can be noticed and be rectified. But it?s much more difficult if these abilities are missing.

Överklagande och dess roll inom bostadsbyggandet : En granskning av plan- och bygglovsprocessen

The aim of this diploma work was to obtain a review of the appeal process in Sweden under the Planning and Building Act and the possibilities of appeal in the planning and building permit process. The work was intended to identify potential problems surrounding the appeal process and possible efficiency measures. The goal was to form a report that provides a satisfactory overview of the appeal process in theory and practical application as well as provide relevant concrete proposals on how the appeal process can be streamlined.Background and facts surrounding the work were taken from different types of literature and through several interviews with representatives in government, industry and politicians.The main problems related to the appeal process are in the long processing times and the high number of appeals. There is a great interest to streamline the appeals process and the government is going to launch studies in which possible future actions will be investigated.It is possible to appeal for up to two instances before you need a so called ?leave to appeal? in order for your complaint to be passed on to the next instance.

Bostadsbebyggelse i Umeå tätort : Flerbostäders bebyggelse i relation till översiktsplaner mellan åren 1998-2014 i Umeå tätort

Urban planning in Sweden goes back to a prolonged tradition, and even since the beginning of the 16th century there´s been general plans for urban planning for cities in Sweden.Nowadays every municipality has a directive from the government to establish or re-new the general master plan covering the whole municipality every 4th year.The aim of this paper is to illustrate and shed light on the extent for the planning document and guidelines, and how they change from every active period and in what extent the provisional planning reaches its visions regarding the outcome of the actual city growth. This study was completed by studying the position of every apartment building that?s been constructed for the chosen area over the years of 2000 - 2014 and draw comparisons between the current master plan main visions regarding constructions ? and comparing the two separate visions to pin out the differences in the same subject.The result shows that there are some deviations from the plans but not as much as one would have thought in the city growth, and some deviations from the different planning documents. Some of the deviations was greater than others but overall the visions was about the same..

Brandsäkerhet i ett småhus

This essay includes the planning and designing of a house as well as writing a rapport about howto increase fire safety in small buildings.More than 6000 homes burn in Sweden every year (Brandskyddsföreningen, 2012c). Thedevastation and the costs are usually very high. This report examines possible measures to reduceboth personal injuries and economic losses resulting from house fires in small buildings.Swedishbuilding regulationsplay a major role when it comes to constructional fire safety. However therequirements inSwedish building regulations are very low for small buildings and this is anargument for raising the requirements.The report shows and describes possible methods to build safer with regards to fire in terms ofmaterials and different building structures. Major focus has been on fire cells but other solutionsare also examined and described.

1 Nästa sida ->